BusinessInfrastructureBuhari Commissions $2.5bn Dangote Fertilizer Plant in Lagos

https://www.westafricanpilotnews.com/wp-content/uploads/2022/03/Dangote-Fertilizer-Commissioning-3-22-22-1280x853.jpg

LAGOS — President Muhammadu Buhari on Tuesday commissioned the Dangote Fertilizer Plant in the Ibeju Lekki area of Lagos.

The President inaugurated the multi-billion dollar facility at an event that was well attended by many political, traditional, and religious leaders, this included key members of the private sector from various parts of the country.

They include the President of the Senate, Ahmad Lawan; Speaker of the House of Representatives, Femi Gbajabiamila; Chairman of the Nigeria Governors’ Forum, Kayode Fayemi; as well as members of the forum including Babajide Sanwo-Olu (Lagos), Darius Ishaku (Taraba), and Badaru Abubakar (Jigawa).

President of Dangote Group, Aliko Dangote; Deputy Secretary-General of the United Nations, Mrs. Amina Mohammed; the Vice-Chairman of Channels Media Group, Mrs. Olusola Momoh; Governor of the Central Bank of Nigeria (CBN), Godwin Emefiele; as well as former Lagos State Governor, Bola Tinubu, were among the dignitaries present at the event.

President Buhari inaugurated the facility as part of activities lined up for his working visit to Lagos. He was also billed to inaugurate the newly built terminal at the Murtala Muhammed International Airport, as well as inspect the ongoing construction at the Dangote Refinery and the Lekki Deep Sea Port.

The Dangote Fertiliser Plant is Africa’s largest granulated urea fertiliser complex. It occupies 500 hectares of land in the Lekki Free Trade Zone and was built at about $2.5 billion.

It is expected to help Nigeria retain $125 million in import substitution and provide $625 million from exports of products from the fertiliser plant.

While Nigeria is estimated to need about five to seven million metric tonnes of fertiliser per annum amid its current level of fertiliser consumption which is 1.5 million metric tonnes, the Dangote fertiliser complex was established to produce three million metric tonnes of urea fertiliser per annum in its first phase.

In the course of its construction, the complex is said to have provided about 5,000 direct and indirect jobs in all categories, an additional 5,000 jobs within the community, as well as created 500 permanent jobs.

 

Bada Yusuf Amoo (Correspondent)

Leave a Reply

Your email address will not be published. Required fields are marked *

WP2Social Auto Publish Powered By : XYZScripts.com